Sunday, 28 September 2008
Kitchen progress
Here's Rob, Anthony-the architect and Teia-the-builder inspecting something in the kitchen. As you can see the boxing has been made in preparation for the concrete counter top to be poured this week. We've received the undermounted double sink and have the dimensions of the gas hob so the boxing needs to have shapes allowed so that when the concrete is poured, everything just slots in perfectly afterwards. I'm keen on a very high shine finish, in a lightish grey or off white. Apparently it's low maintenance and only needs sealing once a year. I still feel a little sad about my Corian, especially as the money saved isn't going to equate into a bathroom Velux as we're so over budget...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment